Q-Note Rev Date Requirements
GN 01/01/2018 A Failure Analysis Report (FAR) for electrical failure returns or a Cause and
Corrective Action Report (CCAR) for all other returns must accompany each
return shipment. Should the required reports not be received or not contain the
proper failure or CCAR information, the material/parts can be returned at
supplier’s expense.
WA 11/01/2016 No Ravenswood Solutions supplier quality note flow down required
WE 11/01/2016 Supplier must have a Counterfeit Electronic Part Detection and Avoidance System in accordance with DFARS 252.246-7007
AO 11/01/2016 Supplier internal inspection system required.
MA 11/01/2016 Supplier ESD program that meets ANSI/ESD S20.20 required
JA 11/01/2016 Battery shelf-life – Supplier shall not deliver material with a shelf life that expires within 120 days of the delivery date.